VIENOVO PLANT RELIABILITY COMMAND CENTER
Downtime · Availability · OEE · Smart Assessment — click any module to open it
Alerts & actions
⚠ BAD ACTORS
📐 Definitions & Settings⟳ Refresh data⬇ Export Excel🖨 Print MTD summary
WeeklyMonthlyQuarterlyMTDYTD
print / save as PDFDowntime Analysis
Pareto — SD · UDT · Total · % · Cumulative %
Cause trend by month
Top Unscheduled Downtime per Site
Overall assessment
✦ Smart analysiswritten from this period's numbersTop losses vs previous period
change-over + unscheduled + forced SDT · click for eventsDay by day
hours lost, then Total DT %Recommendations
✦ Smart analysiswhat to do · what to check · tick when donePlant scorecard
click a plant to focus the summary on itHistory
click a row to open that periodWhere every calendar hour went
OperatingUnscheduled DTChange-over DTForced SDT (lacking RM, full whs, major repair…)Planned non-production (no schedule, rest day)
Plant comparison
click a plant to focus · click a header to sort⚠ = very few delays logged on producing days (e.g. tolling / rental plants) — DT % and availability are unverified, not necessarily good.
Total DT % and UDT % by plant
% of scheduled operating timeMonthly downtime hours
hover for Total DT %Downtime by loss group
CO + UDT + forced SDT hoursTop 10 specific reasons (Total DT)
Weekly trendMonthly trend
Source: Weekly Operations sheet · uses the Period & Plant filtersWhere the time went — Calendar → A → B → C → D
calendar · planned production · operating · net operating · effective — with the losses between each stepTrends by plant
Availability %
Operating ÷ Planned Production TimePerformance %
Net Operating ÷ Operating TimeQuality %
Effective ÷ Net Operating TimeOEE %
Availability × Performance × QualityOEE by plant
hours summed first, then divided · ⚠ = performance above 100%OEE assessment
✦ Smart analysisRecommendations
✦ Smart analysiswhat to do · what to checkOEE history
fleet (selected plants)Capacity waterfall
MT · design → demonstrated → losses → actualWhere each plant's capacity went
share of design capacityActual outputSpeed / small stopsUnscheduled DTChange-overForced SDTPlanned SDTDesign vs demonstrated gap
Capacity by plant
MT · bottleneck = biggest capacity lossActual run rate
MT per operating line-hour · last 12 weeksBottleneck verdict
✦ Smart analysisDie · screen · utilities by plant and line
from the event log · tons per die change = line output ÷ die changesTons per die change
higher = longer die lifeTons per die change — weekly trend
a falling line = more frequent die changesPower interruptions & boiler / steam stops
hours by plantWear & utilities watch
✦ Smart analysisPareto analysis
Ranking
click a row to see the underlying eventsProduction loss & recovery analysis
downtime hours → equivalent tons, at each plant's own monthly run rateActual output + equivalent tons lost to downtime, by month
full bar = potential output without downtime · label = potential MT and recovery opportunity % · click a segment for its eventsMonth breakdown · what the lost tons were
actual output → + each specific downtime in equivalent tons → potential output · click months to add / remove them (All = whole period) · click a bar for its eventsEquivalent lost tons by downtime cause
solid = scheduled · light = unscheduled · click for eventsRecovery opportunity trend
lost tons as % of potential output, by monthPlant comparison · actual vs potential
every plant at its own run rate · label = recovery opportunity · click a plant for its eventsMonthly production performance
click a header to sort · click a month for its eventsRun-rate master · per plant per month
MT per operating line-hour = output ÷ (scheduled − SDT − DT line-hours) · hover for the inputs · the rate each lost hour is converted withLost MT per event = net downtime line-hours × that plant-month's run rate (no output that month → the plant's rate over the selected period, marked *). Net hours are after the app's no-double-counting rules (a line-day never exceeds 24 h). Count: ① Running days only = every stop on days the plant produced (whole zero-output days left out) · ② Avoidable stops = breakdowns + change-overs + forced stops (lacking RM, full warehouse, major repair…) on any day, planned stops left out — same basis as the ₱ downtime cost · ③ Every hour = all calendar hours, every stop and shutdown day (full potential). Estimates only — recovering tons also needs raw materials, demand, warehouse space and hours.
Fleet operating calendar
Full operating dayPartial operating day (some SDT)Shutdown day (scheduled but no output)No production scheduledUnreported
Weekly operating summary
ISO weeks, Monday–SundayDailyWeeklyMonthly
Downtime hours
Forced SDT · Change-over · UnscheduledTotal DT % of operating time
with the warning limitTotal DT % by plant
Warehouse vs Raw-material delays (hrs)
incl. forced SDTActual output vs estimated lost output (MT)
Day status by plant
Change-over performance by type
Set standard times in Definitions & Settings to get excess / within-standard figuresChange-over by plant
Hours per change-over by plant (monthly)
Top change-over reasons
Top 15 equipment by downtime hours
Mechanical / Electrical / PLC hours by plant
Equipment bad-actor trend
Equipment reliability register
Event log
Data-quality checks run on every refresh. They do not change the source sheets — fix the entries in the Google Sheet and press Refresh.
Monthly cross-check vs MR Monthly report
App (from event log + daily calendar) vs MR monthly sheetIssues
KPI definitions
Time accounting (matches the SBO Production MR report)
Calendar line-hours= MR "Working Hours" = 24 h × number of pellet lines (AC & BUKID 48 h/day, others 24 h/day).SDT= Scheduled Downtime hours from the event log, split into Planned non-production (no production schedule, rest day, planned stop, inventory count…) and Forced SDT (everything else: lacking RM, full warehouse, major repair…). The keyword list is editable below.Scheduled Operating Time= Calendar − SDT.Change-over DT= unscheduled hours on Change Over / Change Die / Change Screen.UDT= all other unscheduled hours.Total DT= Change-over DT + UDT (= MR "Total Downtime, hr").Operating Hours= Scheduled Operating Time − Total DT.
Percentages
Total DT %= Total DT ÷ Scheduled Operating Time × 100 (= MR "Total Downtime Rate").UDT %,Change-over %= hours ÷ Scheduled Operating Time × 100.SDT %,Forced SDT %= hours ÷ Calendar × 100.Availability %= Operating Hours ÷ Scheduled Operating Time × 100.Time Utilization %= Operating Hours ÷ Calendar × 100.- When the denominator is 0 (nothing scheduled), the value shows N/A, never 0 %.
No double counting
- The source log records durations, not clock start/end times, so overlap is controlled per line-day: recorded hours on one line in one day can never exceed 24 h, and a plant-day can never exceed its calendar hours. If they do, net hours are scaled down proportionally across the causes (no cause gets the full duration), the raw recorded event-hours are kept, and the day is flagged in Data Quality.
- Every figure is summed from the same plant-day records, so daily, weekly and monthly totals always reconcile. Events are dated by posting date.
Day counting rules
- Full operating day: output > 0 and no SDT that day.
- Partial operating day: output > 0 and some SDT that day.
- No production scheduled: no output, SDT covers the whole calendar, and it is mostly planned SDT. This is not a shutdown day.
- Shutdown day: no output and either the full-day SDT is mostly forced (e.g. lacking RM), or downtime was logged without SDT cover.
- Unreported: no output and no delay logged. These line-hours are excluded from Calendar (so they never inflate availability) and shown as "Unreported line-hours".
- Scheduled production days = Full + Partial + Shutdown. Operating days = Full + Partial.
Production loss (estimate)
Est. lost MT= Total DT hours × rate. Rate = actual run rate (period output ÷ operating hours, per plant) or demo capacity per line-hour (Settings).Hidden loss MT= Forced SDT hours × the same rate.- If no rate can be derived (no output and no demo capacity), lost MT is left blank, never invented. Estimates are not the same as measured shortfall vs target.
Reliability
- Equipment = sub-category of Mechanical / Electrical / PLC / Process events that names a machine. Failure = one UDT event.
MTTR= equipment downtime hours ÷ failures.MTBF≈= plant operating hours in the period ÷ failures (approximation — the log has no equipment run-hours).- Recurring = ≥ N failures of the same equipment within D days (Settings).
Cost of downtime (₱)
Cost rate ₱/ton= 60 % × variable cost per ton + 100 % × fixed cost per ton, from the Monthly MCOS sheet (per plant, per month; percentages editable in Settings). If a month is not yet entered, the latest earlier month is used; a plant with no cost rows uses the NATIONAL rate (both flagged).Downtime cost ₱= lost MT × cost rate, where lost MT = change-over + unscheduled hours × the plant-month run rate.Hidden cost ₱= the same for forced SDT. Planned non-production (no schedule, rest day) is not costed.
Capacity & bottleneck (MT)
- Demonstrated capacity (MR "Demo Capacity", MT/day) is spread over the calendar line-hours of each day. Design → rated gap → demonstrated → planned SDT → forced SDT → change-over → unscheduled DT → speed / small-stop loss → actual output. Speed loss = what the available hours should have produced at the demonstrated rate minus actual output (negative = ran above the demonstrated rate). Capacity utilisation = actual ÷ demonstrated capacity.
Wear & utilities
- Die changes = events in category Change Die (or sub-category Change Die); tons per die change = line output ÷ die changes. Screen changes, roller mentions, power interruptions and boiler/steam stops are counted from the event log text and categories.
OEE (Weekly Operations sheet)
Availability= Operating Time ÷ Planned Production Time ·Performance= Net Operating Time ÷ Operating Time ·Quality= Effective Time ÷ Net Operating Time.OEE= A × P × Q = Effective Time ÷ Planned Production Time. Hours are summed across plants/weeks first, then divided — percentages are never averaged.- Two ideal-rate bases: the sheet's own (ADJ CAPACITY = demonstrated rate, so Performance can exceed 100 % and is flagged ⚠) and the stricter 75 %-of-design-capacity (B75%) block.
- A week is included when it overlaps the selected period. Target OEE = target A × P × Q (Settings).
Loss groups (spec A–L)
- A Changeovers · B Equipment & Maintenance · C Warehouse · D Raw Materials · E Logistics · F Utilities · G Manpower · H Quality · I Planned Shutdown · J Safety/External · K Other · L Process Operations. Mapped from Category + Sub-category (sub-category wins, e.g. "Plant Shutdown / Lacking of Raw Materials" → D).
Settings
saved in this browserData sources (live, read-only)
Roadmap — Phase 2
- Login + roles (Admin, Plant Coordinator, Maintenance, Reviewer, Approver, Executive Viewer) on Supabase.
- Event entry form with start / end clock times → true 24-hour timeline and interval-based overlap removal; primary vs contributing cause.
- Root cause & corrective-action (CAPA) workflow with owner, due date, verification, recurrence after closure; overdue report.
- Draft → submit → review → approve, with full audit trail of corrections; evidence attachments.
- Plant master data (lines, equipment tags, calendars, production rates) editable by Admin.